


-
Industrial Gas Production at Dam Ca Mau Plant
-
110kV Outgoing Transmission Line from Duong Kinh 220kV Substation
-
Installation of the second power transformer at Tan Phu Trung 110kV substation
-
Provision of ICSS/DCS upgrade services at RBDP-A Platform.
-
Supply of various types of OD/ID RMU cabinets (with and without SCADA control functionality)
-
Upgrade service for the 10-AIT-500 mass spectrometer system at Phu My Fertilizer Plant
-
Construction of 220kV Vinh Loc (Ba Queo) Substation
-
Rehabilitation of 110kV Hoa Xa Substation

Vi