Providing Equipments and installing the piping of the gas in GDC Phu My
Client: Petro Viet Nam, GAS DISTR
Time interval: 13/01/2020 to 28/17/2020
Providing Equipments and installing the piping of the gas in GDC Phu My
Client: Petro Viet Nam, GAS DISTR
Time interval: 13/01/2020 to 28/17/2020